Click here to go to the Integrity Group Texas home page
Integrity Group Texas | 800.230.1219 | Contact Us
tell a friend about IGT | sign up for our e-mail bulletins

The Heights

Keystone

The Summit

 

Keystone Estates Restrictions

  • Minimum 1800 sq. ft. conditioned space
  • 100% Masonry requirement - Only 25% can be fulfilled by Hardie-Board
  • No restriction on time to commence construction
  • 1-year building time once construction has begun
  • All plans to be approved by the Architecture Control Committee
  • Domestic household pets only
  • Dimensional shingles, tile or standing seam metal roofing allowed.
  • 1 structure in addition to main dwelling allowed (approved by ACC)
  • Front entry gates allowed on lots over .75 acre
Concept and design by Briscoe Hall, Inc. Powered by the tmSuite™ of Marketing Technologies.